Close to half of Bridgton's housing is seasonal, and much of it was wired with July in mind: a refrigerator, a few lights, the water pump and perhaps a window air conditioner, all fed through 60 or 100 amps. Winterizing a camp on Highland Lake or Long Lake rewrites that load. The pump now cycles through January, heat pumps or baseboards take over from a woodstove or space heater, and a heat-pump water heater tends to come next. Year-round houses reach the same point by another road: oil still heats about 52 percent of Bridgton's occupied homes, and each boiler that gives way to heat pumps adds 240-volt circuits. A box packed with tandem breakers is usually the first clue that the room has run out.
Bridgton also has more mobile homes than most of Cumberland County, nearly 14 percent of its housing and one of the county's highest shares. The usual arrangement is a meter base and disconnect mounted on a post near the home, feeding a panel inside, and the meter base, disconnect, feeder and panel all have to be rated for what the home will now draw. Whether the state requires an electrical permit depends on location: inside a park it does, outside a park it does not. For one- and two-family homes, the state's senior electrical inspector has clarified that a service upgrade now brings an outdoor emergency disconnect, mounted on the building or on a pedestal no more than 50 feet away and in sight of it.
Houses built since 2000, nearly a third of Bridgton's stock, generally started with 200 amps, yet two heat pumps, an induction range and an EV charger on one panel can still outrun them. Adding up the real loads shows whether the fix is a bigger service or a load-management device that keeps the big appliances from peaking together. Goodnow Electric moves homes from 100 to 200 amps, retires fuse boxes, swaps out panels made by Zinsco, Challenger or Federal Pacific, adds surge protection for the whole house, and arranges the disconnect and reconnect with Central Maine Power. The permit goes through the state system, and Goodnow Electric files it and stays with the job until the inspector signs off.