Away from the few main roads that carry three-phase power, Standish is fed by single-phase lines strung through woodland and along the lakeshore, and wind that topples trees takes those lines down too. Maine counted more than 400,000 outages in the October 2017 windstorm, with some homes dark for over a week, and roughly 300,000 more in the December 2023 storm. When a Standish household draws water from its own well, losing power also means losing the pump, so the taps go dry along with the heat. A sump pump that stops during a spring thaw can add a flooded basement to the list, and a freezer full of food starts its own countdown.
The Portland Water District keeps its treatment plant, storage tanks and much of its pipe network in Standish, yet the town's plan describes public water within Standish itself as limited. Homes beyond the mains rely on submersible well pumps, and oil and propane boilers cannot fire or circulate hot water without current. With a standby generator wired through an automatic transfer switch, the whole house comes back on its own, and nobody has to step out into the storm to start anything. Natural gas is essentially unavailable here, so standby units run on propane, which roughly a quarter of local homes already use for heat. Owners who prefer a portable unit should feed chosen circuits through a panel interlock and a correctly rated inlet; a cord plugged into a dryer outlet is not safe.
Placement takes thought near water. The shoreland zone covers ground within 250 feet of Sebago Lake, Watchic Lake and the Saco and Presumpscot rivers, and along the Saco a separate body, the Saco River Corridor Commission, has jurisdiction out to 500 feet, so confirm setbacks with the Standish code office before choosing a pad. The town's electrical fee schedule lists a per-unit generator fee, Goodnow Electric pulls that permit, matches the generator's size to the circuits that truly matter in an outage, and wires the transfer switch so the house cannot push power back onto CMP's lines. Before any concrete goes down, you get a free written estimate naming the generator size, each circuit it will run and the permit.